Will the Permitted Development Rights from offices to residential be extended to May 2019 ?27/7/2015 Permitted Development rights were introduced in May 2013 to allow for the change of use of buildings from B1 (a) (offices) C3 (dwellinghouses) subject to a prior approval process by the local planning authority. As part of these requirements there are a number of criteria to adhere to. Associated external physical works may still require planning permission.
0 Comments
Leave a Reply. |
Author
Daniel Bourke is the owner of Belvoir Lettings Dunstable and in his previous career in Architecture he was an Associate in a leading London Architectural practice Archives
November 2018
Categories |